Ammonia Storage Project

Ammonia Storage Project

Chemical Plant Beulah, ND
2012-2013

The Ammonia Storage Project brought the full extent of ICI’s capabilities into play.  ICI’s scope of work involved equipment setting, HVAC, piping, process tie-points, flare stack installation, steel erection, electrical, instrumentation, and controls for the project.  The process involved installation of the following pieces of equipment:

  • Two stage ammonia compressors
  • Interstage flash drum
  • Knockout drum
  • Air cooled condensers
  • Shell and tube heat exchangers
  • Glycol heating skid
  • Loadout pumps
  • Rail loadout platforms and loading arms
  • MCCs
  • Power and lighting panels
  • Makeup air handling unit
  • Control panels
  • Heat trace
  • Safety showers
  • Vacuum breakers and pressure relief valves